AdventHealth Parker OR/Med Surge Addition and Renovation
AdventHealth Parker OR/Med Surge Addition and Renovation | Parker, Colorado
Completed as GE Johnson Construction Company
The AdventHealth Parker Hospital, originally built by our team in 2003, provides excellence in healthcare for the people of Colorado. This new project included extensive additions and renovations to the existing facility.
About the Project
Since constructing the original 300,000-sq.-ft. AdventHealth Parker Hospital in 2003, our team has completed numerous renovations, expansions, and additions to the campus. The OR/Med Surge project included a two-story parking garage, a 24-bed neurological/joint/spine medical surgery unit, a rehab gym, and a 2-story, 6,650-sq.-ft. building adjacent to the existing Emergency and Surgery departments. Approximately 6,500 sq. ft. was also added above the Children’s Emergency Department. Four psychiatric patient rooms were created on the lobby level, along with four new operating rooms, staff locker rooms, a staff lounge, offices, and storage areas. A two-story precast concrete and stone veneer parking structure added 170 additional parking stalls to the campus, improving patient and visitor accessibility.
Ingenuity in Action Improving Patient Recovery Time
Due to the adjacency of the project to functioning operating rooms and office spaces, preventing construction noise and facility disruption was top of mind for our project team. Construction work that was noisy and caused vibration was sometimes suspended due to the proximity to the pre-op area where patients were awaiting procedures. The project team continually communicated with Parker Hospital staff in order for everyone to work together toward the best solutions and to execute the work while managing patient experiences. This project also entailed several renovations within the PACU pre-op areas, which were all preformed with little impact to the hospital’s operations. Our strong relationship with the facilities and administration of AdventHealth Parker contributed to the successful phasing of the projects to allow for continued hospital operations.
A new building section was also added adjacent to the ambulance entry, which had to remain open and accessible for the project duration. This portion of the project was also adjacent to functioning operating rooms and the children’s hospital. These areas needed to remain open and functioning while we built in close proximity; accordingly, a temporary entrance was constructed and an elevated platform was installed for the work to occur above the ambulance drive. This approach was well coordinated with the EMS staff at the hospital so all users felt the approach was effective.
The Little Details
- Additional new scope - an emergency department addition and trauma room renovation - was completed with only a three-week schedule extension.
- The safety program, which was designed to minimize exposure to hospital patients, successfully logged 54,996 labor hours with no lost time injuries.
- The selected finishes are high-end to resemble a hotel, as the space is intended for patients’ short term recovery.