Patient exam room

AdventHealth Mount Dora Medical Office Building Level 2 Buildout

AdventHealth Mount Dora Medical Office Building Level 2 Buildout | Mount Dora, FL

This project transformed the second-floor shell space of an existing medical office building into a comprehensive outpatient clinic for AdventHealth Medical Group. The build-out included 18 exams rooms, 2 OB/GYN procedure rooms, X-Ray installation, 4 nurses stations, 3 physician offices, a space for medical assistants, a work room and a scheduling office. The new space accommodates urology, cardiology, orthopedics, imaging and gynecology services, creating a modern, patient-centered environment designed to support a wide range of specialty care.

About The Project

The project scope included construction of an X-ray suite with owner-furnished imaging equipment, as well as the installation of a new two-stop elevator within an existing shaft to improve patient and staff access to the second-floor clinic. DPR also completed key self-perform work scopes, including drywall, door frames and hardware, acoustical ceiling systems and specialties, helping deliver a high-quality finished space that supports long-term operational efficiency.

It was an excellent experience working with DPR due their team’s consistent communication, responsiveness and problem-solving mindset. Any challenges or concerns throughout the project were identified and communicated early and the team brought us options for resolution – displaying a collaborative approach. The experience and construction knowledge displayed by the entire team was noteworthy.

Beth Kraljev, Project Manager

AdventHealth

Nurses station
Patient exam room
patient exam room
waiting area
Patient exam room
Nurses station
Patient exam room
We think you'll like this, too.

File Download