Rendering of new tower

Medical City Plano Vertical Expansion

HCA Medical City Plano Vertical Expansion | Plano, TX

DPR’s fifth project on an HCA campus in the Dallas-Fort Worth metroplex, this expansion at Medical City Plano Hospital strengthens an ongoing partnership while supporting future growth. The project includes a vertical expansion of Tower C, adding levels 5 through 8, along with significant renovations to levels 1 through 4. Upgrades include the installation of new patient and trauma elevators to enhance circulation and care delivery. Levels 7 and 8 will be delivered as shell space to accommodate future bed capacity. The roof will feature two helipads and dedicated EMS support spaces, further advancing the hospital’s emergency response capabilities.

Challenges And Solutions

Active 

Helipad

Because this work is taking place at an active healthcare facility, helicopters essential to patient care must continue landing at all times to transport patients in need. This created a unique challenge for the team to navigate, requiring the 800-ton crane to pause operations during each landing and then safely resume work afterward.

Minimizing

Disruption

Another challenge to expanding upon this facility is the work being put into place just one floor above active patient floors. This requires our team to carefully coordinate with crews and hospital staff to ensure the top priority is always patient care and comfortability.

Active construction site and crane next to helipad on the ground
Rendering of new tower with helipad on top
Challenges

And Solutions

Active construction site and crane next to helipad on the ground
Active 

Helipad

Because this work is taking place at an active healthcare facility, helicopters essential to patient care must continue landing at all times to transport patients in need. This created a unique challenge for the team to navigate, requiring the 800-ton crane to pause operations during each landing and then safely resume work afterward.

Rendering of new tower with helipad on top
Minimizing

Disruption

Another challenge to expanding upon this facility is the work being put into place just one floor above active patient floors. This requires our team to carefully coordinate with crews and hospital staff to ensure the top priority is always patient care and comfortability.