The Georgia State University Science Park Phase II project includes the interior build-out of the remaining three floors of the existing building. Construction also included a pedestrian bridge, with self-dimming View Dynamic Glass, connecting the building to the existing Petit Science Center. Two of the floors consist of open research laboratories with support spaces, offices, and a conference room.

The remaining floor is a vivarium with sections rated for BSL 1, 2 and 3 work; a bulk sterilizer; cage and rack washer and tunnel washer. Mechanical upgrades to the facility consist of an additional chiller, cooling tower, make up air units, exhaust fans, and an energy recovery system. Associated electrical upgrades and integration into the existing building controls system were also included.

Award

  • University System of Georgia - Innovation Award for Design & Technology (2017)