Energy Innovation Center

University of Wyoming | Laramie, Wyoming

Completed as GE Johnson Construction Company

The Energy Innovation Center (EIC) provides research laboratories, offices, meeting space, publication facilities and presentation space for the faculty and students of the University of Wyoming in Laramie, Wyoming.

About the Project

The design concept for the University of Wyoming Energy Innovation Center (EIC) is modeled after the nation’s top-tier national laboratories with both 3D visualization and analytical lab spaces. The goal of this project was to raise the bar for research and teaching facilities nationwide.

The EIC features an enhanced Rock X-Ray Lab – the only one of its kind in the world. Other enhancements include a specialized dehumidification system, multiple lab and mechanical/electrical system redundancies, state-of-the-art audio/visual systems and electrified “smart glass” partitions.

57,000

Total Sq. Ft.

2

Million dollars saved as a result of preconstruction cost analysis.

2

Foot thick concrete slab on deck contains scaled down wind turbines used in experiments. 
student gathering and server room

Ingenuity in Action Innovation for energy research

Quality control was one of the main concerns on this project. GE Johnson actively managed quality concerns with quality control logs and monitored and resolved items as they arose. Because the building was extremely Mechanical/Electrical/Plumbing (MEP) intense, the GE Johnson team utilized Building Information Modeling (BIM) and MEP coordination meetings with subcontractors, the University, designer and commissioning agents to address any MEP quality control or coordination issues. Implementing these quality planning measures resulted in a very high-functioning MEP system.

The EIC was also an infill project – set between two existing buildings, sharing a dock with an adjacent building. GE Johnson built partitions and screens over adjacent building air intakes to mitigate construction fumes and noise, and scheduled “just-in-time” deliveries for construction materials. All utility shutdowns were scheduled during off hours and weekends. Most importantly, we continuously communicated with the University regarding site activities and material deliveries.

energy 3D cave
large conference and classroom
energy rock x-ray and oil recovery lab
student gathering and server room
oil recovery lab room
energy 3D cave
large conference and classroom
energy rock x-ray and oil recovery lab
student gathering and server room
oil recovery lab room

The Little Details

  • The EIC is designed and constructed to meet LEED Gold certification standards.
  • The main student gathering area has movable partitions made of Smart Glass which go from opaque to clear at the flip of a switch. 