A brewing tank that reads Golden Moon Distillery outside a one story building with vehicles parked in front.

Premium Handcrafted Distillery

Golden Moon Distillery | Golden, Colorado

Completed as GE Johnson Construction Company

This project was a major expansion of a premium handcrafted distillery.

Partners

  • Client Golden Moon Distillery

The Big Picture

The build-out of the Golden Moon Distillery in Golden included the installation of a 30-foot-tall grain silo, a hammer mill, a 500-gallon mash tun, and a 200-gallon lauter tun. In addition, two 500-gallon pot stripping stills, three 500-gallon fermenting tanks, two 240-gallon spirit stills, and six 50-gallon spirit stills, all with condensers and spirit columns, were installed. The project required extensive process piping, new civil tie-ins, a boiler, a chiller, a cooling tower, and an explosion-proof H-3-rated room. A barrel storage room and bottling equipment were also part of the project.

8,900

Total Square Feet

116

Days with no injuries

18,040

Expanded still capacity in gallons

Ingenuity in Action

The cooling tower was specified to receive 460v in a 208v building. The project team worked with the electrical engineer and electrical subcontractor to install a step-up transformer, allowing the cooling tower to receive the proper amount of power.

A brewing tank that reads Golden Moon Distillery outside a one story building with vehicles parked in front.
An interior room with brewing equipment.
A brewing tank that reads Golden Moon Distillery outside a one story building with vehicles parked in front.
An interior room with brewing equipment.

Fast Fact

  • The schedule duration was only 18 weeks with long lead items procured from all over the country.

File Download