full view of the building from the entrance road

Ent Credit Union Headquarters

Ent Credit Union Headquarters | Colorado Springs, Colorado

Completed as GE Johnson Construction Company

This five-story headquarters building and four-story parking garage is home to Colorado’s largest credit union.

About The Project

The new Ent Credit Union Headquarters features a two-level cafeteria that faces Pikes Peak, a fitness center with cardio and weightlifting machines, spinning cycles and a yoga studio, eight training rooms, workstations that can be raised and lowered for working while standing or sitting, rooms for employees to make private phone calls, and several other amenities. The campus is also home to a parking structure with 830 parking spots.

Construction included significant site infrastructure improvements and a new headquarters focused on employee retention. This area of Colorado Springs is undergoing significant growth and construction, requiring coordination with deliveries and safe access for nearby and adjacent businesses.

325,000

Total Sq. Ft.

1,985,000

Pounds of rebar in precast

765,000

Linear feet of prestressing strand
exterior building lit up at night

Ingenuity in Action Modern Colorado Springs Office Space

GE Johnson created an in-house interim grading plan that was used by the land-selling developer to provide a pad-ready site through their over lot process. This eliminated duplicate work for earthworks.

The project team had a goal of reducing costs by eliminating multi-sizing of the architectural wall system, which can be costly. During schematic design, a plan was formulated with the precast engineer to minimize camber in precast tees. This enabled flat, elevated slabs and cost reduction that the team was seeking.

Six months of planning and coordination enabled Ent Credit Union to simultaneously operate and transfer their data center operations from the former headquarters building to the new one during construction. Pre-planning with the Colorado Springs Fire Department also allowed for 80% of office furniture to be installed prior to receiving TCO.

interior lobby
interior lobby with a reception desk and seating areas
lobby seating area with a view of the front windows
lobby seating area with floor to ceiling windows and a view of the mountains in the horizon
cafeteria and food service area
dining seating area
dining seating area
working seating area with floor to ceiling windows and mountain views
interior elevator and check in area
restroom sinks and mirrors
gym / exercise facility with views of the mountains out the windows
meeting room with a round table and chairs
interior lobby
interior lobby with a reception desk and seating areas
lobby seating area with a view of the front windows
lobby seating area with floor to ceiling windows and a view of the mountains in the horizon
cafeteria and food service area
dining seating area
dining seating area
working seating area with floor to ceiling windows and mountain views
interior elevator and check in area
restroom sinks and mirrors
gym / exercise facility with views of the mountains out the windows
meeting room with a round table and chairs

The Little Details

  • A 32-foot tall, two-story structural glass wall provides panoramic views of the front range.
  • Drones captured video of the building’s exterior to verify the installation of sealants on the glazing system.
We think you'll like this, too.