DPR constructed this sophisticated, medical office build-to-suit project on time and on budget despite winter rains that substantially delayed the project. The 105,000-sq.-ft. imaging facility included structural and other requirements associated with working with magnetic resonance imaging (MRI) equipment. The main facility is located in the basement, with half of the first floor dedicated to breast-imaging. The balance of the first floor as well as the second floor are dedicated to a 170-stall parking structure.

Urban development on a zero lot line is not without its challenges. With the lack of a material storage area, DPR developed a "just in time" material delivery system. Materials were delivered and installed on the day needed and not a moment before. In addition, the project team developed a site specific safety plan that ensured the safety and minimal disruption to the residents of an apartment complex that was in close proximtiy of the site. 