<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0"
    xmlns:dc="http://purl.org/dc/elements/1.1/"
    xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
    xmlns:admin="http://webns.net/mvcb/"
    xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#"
    xmlns:atom="http://www.w3.org/2005/Atom"
    xmlns:content="http://purl.org/rss/1.0/modules/content/">
    <channel>
    
  
    <title>DPR Advanced Technology Projects</title>
    <link>http://www.dpr.com/projects/</link>
    <description>Projects from the DPR website posted in "Advanced Technology"</description>
    <dc:language>{channel_language}</dc:language>
    <dc:creator>website@dpr.com</dc:creator>
    <dc:rights>Copyright 2011</dc:rights>
    <dc:date>2011-12-16T22:30:06+00:00</dc:date>
    <atom:link href="http://www.dpr.com/rss/projects/core-market/advanced-technology" rel="self" type="application/rss+xml" />
    <admin:generatorAgent rdf:resource="http://www.expressionengine.com/" />

  
  <item>
    <title>Assurant Data Center</title>
    <link>http://www.dpr.com/projects/assurant-data-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/assurant-data-center#when:15:34</guid>
    
    <content:encoded><![CDATA[<p>
	DPR Atlanta recently won this hard bid data center renovation with insurance&nbsp;provider Assurant. The project will consist of renovating 19,000 sq. ft. of an&nbsp;existing commercial print shop in preparation for and expansion of the Tier III data&nbsp;center.</p>
<p>
	The data center includes access flooring, starline busway, gaseous fire suppression&nbsp;and extensive power monitoring and a state of the art security system. Supporting&nbsp;the data center expansion will be the construction of a new utility yard, consisting&nbsp;of a concrete soil retention wall, two 1.2 mega-watt generators, a chilled water&nbsp;storage tank, and two 160 ton chillers.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Tue, 27 Nov 2012 15:34 GMT</pubDate>
  </item>
  
  <item>
    <title>HCA Nashville Data Center</title>
    <link>http://www.dpr.com/projects/hca-nashville-data-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/hca-nashville-data-center#when:00:32</guid>
    
    <content:encoded><![CDATA[<p>
	Currently under construction outside of Nashville, TN, HCA&rsquo;s new data center is an expandable facility, capable of meeting the healthcare provider&rsquo;s immediate needs and accommodating future growth. The initial phase is the construction of a 100,000-sq.-ft. structure with a 30,000-sq.-ft. raised floor with 12 MW systems and related utilities, 10,000-sq.-ft. office area, and warm shell space for future expansion.</p>
<p>
	DPR&rsquo;s design-build partner on the project is PageSoutherlandPage. Together they have completed approximately $200 million in data centers in Texas.</p>
<p>
	<strong>Technical Details</strong>: The data center will be outfitted with 12 MW systems over 30,000 sq. ft. of white space with the following equipment set:</p>
<ul>
	<li>
		1 N Utility Feed At 161 KV (By Others)</li>
	<li>
		Single-Ended 161 KV Substation Rated At 20 MVA With Provisions For Double Ending (By Others)</li>
	<li>
		Tri-Bus 15 KV Switchgear With Auto Transfer Capability</li>
	<li>
		Underground Medium Voltage Distribution In Tri-Bus Configuration For Critical Power</li>
	<li>
		Overhead Low Voltage Distribution To White Space</li>
	<li>
		Underground Medium And Low Voltage Distribution In Traditional A/B Bus Configuration For House Power And Mechanical Loads.</li>
	<li>
		3 Mode (Single Bus, Double Bus, And Tri-Bus) Medium Voltage N+1 Diesel Rotary UPS (DRUPS) Plant With 24 Hour Fuel Storage</li>
	<li>
		120/ 208V Remote Distribution Panels (RDP&rsquo;s) And Remote Power Panels (RPP&rsquo;s) For White Space Legacy Equipment</li>
</ul>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Tue, 19 Jun 2012 00:32 GMT</pubDate>
  </item>
  
  <item>
    <title>Fortune Evergreen Data Center Phase I</title>
    <link>http://www.dpr.com/projects/evergreen-data-center-phase-i</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/evergreen-data-center-phase-i#when:20:36</guid>
    
    <content:encoded><![CDATA[<p>
	The phase 1 development at Fortune Oregon 1 provides 7.8 MW of concurrently maintainable critical load; the property meets Essential Facility standards for seismic, snow, and wind, and has received substantial upgrades for electric utility service. DPR Fortis Mission Critical is serving as the Joint Ventura General Contractor. Rosendin Electric and Apollo performed the electrical and mechanical work respectively. Lee Technologies provided commissioning oversight and integrated commissioning testing services.</p>
<p>
	Phase 1 facility features include:</p>
<ul>
	<li>
		High-Availability, concurrent maintainability on all components</li>
	<li>
		Entire critical load fully Level 5 Commissioned</li>
	<li>
		38,253 sq. ft. of data hall white space</li>
	<li>
		Supports average energy densities of 200 watts/sq. ft.</li>
	<li>
		Structurally Sound: FEMA 356 &ldquo;Essential Facility&rdquo; category</li>
	<li>
		Seismically Reinforced: Building and all improvements seismically reinforced to a 1.5 Structural Importance Factor</li>
	<li>
		Carrier-Neutral: Six Tier I carriers on-property: Level 3, AboveNet, CenturyLink (Qwest), AT &amp;T, Verizon Business and Tata Communications.</li>
	<li>
		Low latency: 17 msRT to San Jose, 3.5 msRT to Seattle, 45 msRT to Chicago, and 87 msRT to Tokyo, Japan</li>
</ul>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Thu, 31 May 2012 20:36 GMT</pubDate>
  </item>
  
  <item>
    <title>NOV Goodyear Modular Data Center</title>
    <link>http://www.dpr.com/projects/nov-goodyear-modular-data-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/nov-goodyear-modular-data-center#when:06:37</guid>
    
    <content:encoded><![CDATA[<p>
	This&nbsp;new 28,512-sq.-ft. single-story tilt panel structure includes office space, a network operations center and equipment yard. The infrastructure includes twin 1500 kw generators and enclosures, twin 1200 kVa Active Power UPS enclosures, switchgear and one HP EcoPod. The first phase build-out included&nbsp;the equipment yard structure and rough-in for a second EcoPod and associated electrical equipment. Additionally, the scope also included covered parking, civil, landscape and offsite improvements&nbsp;to the 6 acre lot. This is a master-planned site&nbsp;designed with flexibility to expand office modules or up to a total of 8 EcoPods, 16 UPS and Generators.</p>
<p>
	&nbsp;</p>
]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Tue, 03 Apr 2012 06:37 GMT</pubDate>
  </item>
  
  <item>
    <title>Cobb Energy Performing Arts Centre</title>
    <link>http://www.dpr.com/projects/cobb-energy-performing-arts-centre</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/cobb-energy-performing-arts-centre#when:17:00</guid>
    
    <content:encoded><![CDATA[<p>
	The Cobb Energy Performing Arts Centre is a 2,754-seat world-class theater with a 26,500-sq.-ft. banquet hall with a full-service kitchen, a 600-seat ballroom, production spaces, administrative offices and building services facilities.&nbsp; A four-level, 700-space parking deck was also constructed adjacent to the theatre to provide easy access to the facility. The theatre is designed to accommodate a broad range of potential uses including Broadway touring shows, touring popular music concerts, dramatic events, comedy acts, ballet, opera and corporate events.</p>
<p>
	The theatre is built in the style of traditional European theaters, yet features state-of-the-art comfort and technology. Sound acoustical joints keep all vibrations from the structure so no noise will disturb the shows.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Sun, 25 Mar 2012 17:00 GMT</pubDate>
  </item>
  
  <item>
    <title>eBay Project Mercury Data Center</title>
    <link>http://www.dpr.com/projects/ebay-phoenix-data-center-project-mercury</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/ebay-phoenix-data-center-project-mercury#when:23:29</guid>
    
    <content:encoded><![CDATA[<p>
	Project Mercury&nbsp;includes the fit-out of the first floor whitespace and three modular IT containers on the roof of the 23,000-sq.-ft. shell warehouse building that&nbsp;DPR completed in December 2010. The structural steel of the building is the same weight as an eleven-story &ldquo;similar foot-printed&rdquo; building. However, the roof is designed to carry up to one million pounds in additional weight for the pre-fabbed data IT containers.&nbsp;The facility has been transformed&nbsp;into high density Modular Data Center spaces with 4MW of initial IT load, with infrastructure to support 12MW of ultimate IT load. EMEP infrastructure includes 3MW medium voltage generators, 2MW medium voltage UPS modules, modular chiller plant and cooling towers. eBay&#39;s primary intent for Project Mercury is to develop and test all types of cutting-edge cooling technologies for computer servers by&nbsp;seeking out the most energy-efficient, lowest energy use cooling methods and&nbsp;share the technology&nbsp;globally. Where better to test for cooling systems than in Phoenix where the &ldquo;mercury&rdquo;&nbsp;is record-breaking?</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 04 Jan 2012 23:29 GMT</pubDate>
  </item>
  
  <item>
    <title>Emulex Tenant Improvement</title>
    <link>http://www.dpr.com/projects/emulex-tenant-improvement</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/emulex-tenant-improvement#when:16:03</guid>
    
    <content:encoded><![CDATA[<p>
	This 38,685-sq.-ft. fast-track office improvement, which includes a 10,000-sq.-ft. data center, is the model for Emulex&rsquo;s corporate office environment. The first floor houses office space, a large break room,&nbsp; shipping/material handling area, data center, and device testing and hardware laboratory with epoxy floors.&nbsp;The second floor houses the main lobby, a boardroom and conference and open office space.&nbsp;The project also includes two exterior cooling towers and a masonry enclosure, CRAC units that support the date center for cooling and a Starling Bussway system for power distribution.</p>
<p>
	Despite significant changes to the electrical scope of work, DPR managed the schedule to achieve the original occupancy date for the customer&rsquo;s move-in.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 07 Dec 2011 16:03 GMT</pubDate>
  </item>
  
  <item>
    <title>Apple Flagship Store</title>
    <link>http://www.dpr.com/projects/apple-flagship-store</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/apple-flagship-store#when:17:25</guid>
    
    <content:encoded><![CDATA[<p>
	A 16,089-sq.-ft. two-story retail store located in the heart of San Francisco, the building exterior was conceived as a simple metal box elevated above a glass and stone base.</p>
<p>
	The stores are more than just a place to sell products; it encourages consumers to &ldquo;come, touch and test drive the products." This is why the interior is introduced to create openness and visibility across the store--to the products on display and to the customer activity. Central to the two-story space are a series of structural glass elements (stair, bridge and skylight) uniquely designed for Apple&#39;s High Profile Stores.</p>
]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Thu, 01 Dec 2011 17:25 GMT</pubDate>
  </item>
  
  <item>
    <title>VMWare Corporate Campus</title>
    <link>http://www.dpr.com/projects/vmware-corporate-campus</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/vmware-corporate-campus#when:22:17</guid>
    
    <content:encoded><![CDATA[<p>
	The VMware campus is a 460,000-sq.-ft. office complex consisting of five, two-story buildings to house an executive area, data center, cafeteria, fitness center and complex landscaping. The shell is steel and concrete with a plaster, metal panel, and storefront skin system.</p>
<p>
	Situated on a 37-acre site in Palo Alto&#39;s prestigious Stanford Research Park, the property features vistas, dozens of mature trees, generous landscape setbacks, and mature landscape areas. The buildings circle a large central courtyard that will serve as the heart of the VMware community.</p>
]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 22:17 GMT</pubDate>
  </item>
  
  <item>
    <title>University of Texas at Austin High Performance Computing Facility Expansion</title>
    <link>http://www.dpr.com/projects/high-performance-computing-facility-expansion</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/high-performance-computing-facility-expansion#when:00:58</guid>
    
    <content:encoded><![CDATA[<p>
	The High Performance Computing Facility Expansion adds an additional 10,000 sq. ft. of high-density data center space to the renowned Texas Advanced Computing Center (TACC) which hosts high-end research-focused computing systems. With 625 watts/sq. ft., the new super-computer facility houses the fifth-fastest computer in the world. The project also includes an 8,000-sq.-ft. stand-alone central plant.</p>
<p>
	Despite a very fast schedule and highly complex scope, the project was completed under budget and with just 16 punchlist items at substantial completion.<br />
	<br />
	<strong>Fast Computer, Fast Schedule</strong><br />
	It almost goes without saying that one of the fastest computing facilities in the world would be built on an equally fast schedule. The 10-month schedule included minimum 56-hour workweeks for the field teams, sometimes with only DPR-mandated days off. In addition, there were 41 weather impact days&mdash;far more than usual in Austin&mdash;that were absorbed by the schedule.<br />
	<br />
	All owner milestones were completed on time or early, and the owner was able to move into the space two months early to begin build-out of the super-computer. The project was also awarded the University of Texas Safety Through Exemplary Performance (STEP) Silver Award. The project was completed with zero accidents, zero recordables and zero&nbsp;lost time incidents.<br />
	<br />
	<strong>Self Performed Work</strong><br />
	DPR self-performed demolition, drywall, accessory installation and concrete to help drive the schedule and fill in difficult to contract scopes.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:58 GMT</pubDate>
  </item>
  
  <item>
    <title>University of Texas at Austin Data Center Renovation</title>
    <link>http://www.dpr.com/projects/austin-data-center-renovation</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/austin-data-center-renovation#when:00:55</guid>
    
    <content:encoded><![CDATA[<p>
	The design-build team of DPR Construction and PageSoutherlandPage/Sunland Group converted this former central receiving building into a 26,000-sq.-ft. Tier 3 data center with 1.44MW of power. The facility includes 9,000 sq. ft. of 2&#39; raised floor white space with another 17,000 sq. ft. of support, office and MEP equipment space.</p>
<p>
	The project design includes the use of UPS flywheels in lieu of the more typical static batteries. The UPS flywheels have several advantages for this project: they use about 30% less space than static batteries, are not potential explosion hazards, don&#39;t require special room ventilation, and have a life span of approximately 20 years. In emergency situations they provide 14 seconds of load at 100%, which is more than enough time for emergency generators to reach full capacity.</p>
<p>
	In lieu of the split DX units that were planned for the roof, the team recommended using Water-Cooled Chillers and a Cooling Tower. DX units are less expensive to install, but much more expensive to run. Using life cycle energy analysis tools with the BIM, the team determined that although the Water-Cooled Chillers were more expensive to install, over a 15-year period the University would save upwards of $16 million in energy and maintenance costs.</p>
<p>
	The ceiling in the data center white space was lower than in a typical data center, and did not have the load capacity to support the data cable trays. The team designed the load from the cable trays to be supported from the raised access flooring below. Rather than hanging from the ceiling, the trays are supported from below via poles at the base of the server cabinet.</p>
<p>
	The cable tray support system was designed electronically in BIM, and run through clash detection software during design. The team was able to see exactly how much space was available for cabling, and make adjustments where needed. In some instances, the design left as little as &frac12;&rdquo; clearance. Having the entire design and construction team involved in the clash detection, accurate changes could be made in the drawings rather than the field when changes are more costly to implement.</p>
<p>
	To help expedite the schedule, an early release package for abatement was developed for the portion of the building that was unoccupied prior to the project starting. When the building was vacated, DPR was able to move quickly and could focus on the white space, demarcs and electrical room demo and build-back.</p>
<p>
	Technical Details</p>
<ul>
	<li>
		Tier Level: Tier III</li>
	<li>
		Structure: Precast concrete</li>
	<li>
		Raised Floor: 9,000 sq. ft.</li>
	<li>
		Critical Load: 1.44 MW</li>
	<li>
		Watts/square foot: 150/sq. ft.</li>
	<li>
		Hot aisle/cold aisle containment</li>
	<li>
		Rotary Flywheel Uninterruptible Power System (UPS): 2N</li>
	<li>
		Chilled Water System: N+1 system for cooling of white space and UPS rooms</li>
</ul>
]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:55 GMT</pubDate>
  </item>
  
  <item>
    <title>Fortune Data Centers Facility Conversion - Data Center Phase 1</title>
    <link>http://www.dpr.com/projects/facility-converstion-data-center-phase-1</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/facility-converstion-data-center-phase-1#when:00:38</guid>
    
    <content:encoded><![CDATA[<p>
	This state-of-the-art 16 MW high density data center offers 40,000-sq.-ft of data room space at 200 watts/sq. ft. with data room ceiling height of 11 feet, 6 inches from slab to lower side of ceiling grid. Phase 1 development is capable of supporting 8 Megawatts of IT Critical Load. Through the combined effects of sustainable construction and ongoing energy efficiency, this data center is LEED-CI Gold certifed.</p>
<p>
	Phase 1 features include:</p>
<ul>
	<li>
		Tier III design: N+1 to 2N Redundancy on all Systems</li>
	<li>
		EYP Commissioned, Supporting Energy Densities of 200 watts/sq. ft. throughout</li>
	<li>
		All improvements seismically reinforced to a 1.5 Structural Importance Factor</li>
	<li>
		PUE 1.37</li>
</ul>
]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:38 GMT</pubDate>
  </item>
  
  <item>
    <title>Facebook Forest City Data Center</title>
    <link>http://www.dpr.com/projects/forest-city-data-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/forest-city-data-center#when:00:36</guid>
    
    <content:encoded><![CDATA[<p>
	The Forest City campus is comprised of two 370,000-sq.-ft. buildings. Both buildings are divided into four separate data suites and each of the data suites includes roughly 40,000 sq. ft. of white space. Targeting LEED Gold certification, a key sustainable feature is a separate 25,000-sq.-ft. air handling penthouse for each data suite that utilizes a 100% evaporative cooling method. Each data suite is fed by a 3.5MW dedicated electrical feeder room and backed up by four 3000Kw CAT (Caterpiller) generators. DPR also collaborated with the local utility company to construct an on-site medium voltage transmission substation.&nbsp;</p>
<p>
	Pre-set goals for the project included:&nbsp;</p>
<ul>
	<li>
		Completion of each phase ahead of schedule</li>
	<li>
		Zero defects at substantial completion of each phase</li>
	<li>
		Exceeding 75% local workforce participation</li>
</ul>
<p>
	In order to beat the schedule, DPR incorporated Lean construction practices for an open and consistent dialog between trades resulting in higher predictability and smoother workflow. By using this collaborative approach, each phase of the project was not only delivered ahead of the contracted schedule but also with zero defects at substantial completion. This allowed Facebook to begin populating their data suites and trafficking live data sooner. To exceed the hiring goal, DPR collaborated with subcontractors, held career fairs, and posted hiring information to Facebook and other websites. This dedicated team effort allowed the project to attain 90% its manpower from the local workforce for both buildings.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:36 GMT</pubDate>
  </item>
  
  <item>
    <title>Facebook Sweden Data Center</title>
    <link>http://www.dpr.com/projects/sweden-data-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/sweden-data-center#when:00:33</guid>
    
    <content:encoded><![CDATA[<p>
	DPR Construction is currently building the first phase a huge new data center campus in northern Sweden to support the rapid global growth of Facebook&rsquo;s users. The new ground-up campus in Lulea, Sweden is Facebook&rsquo;s first facility outside the United States. The location takes advantage of the cool climate in Lulea, a seaside town of approximately 45,000, located at approximately the same latitude as Fairbanks, Alaska. That cool weather allows Facebook to use outside air to cool the tens of thousands of servers that will occupy the new data centers.</p>
<p>
	Facebook plans to build multiple data centers on the Lulea campus, beginning with a 290,000 sq.-ft. first phase that was completed in late 2012, and begin supporting traffic in the first half of 2013.</p>
<p>
	The expansion of Facebook&rsquo;s infrastructure beyond the U.S. reflects the increasingly global makeup of its user base. More than 75 percent of Facebook&rsquo;s 800 million users are located outside the United States. Building data centers closer to these users will improve the speed of their connection and overall Facebook experience. The Facebook announcement has been celebrated in Sweden, and particularly in Lulea, where economic development officials have been marketing the region as a data center destination due to its combination of a cool climate, strong connectivity and plentiful supply of cheap, renewable energy.</p>
<p>
	The cool, dry climate allows the use of outside air to cool the data centers, similar to Facebook&#39;s Prineville, OR and Forest City, NC sites (also built by DPR). The average daily temperature in Lulea ranges from high of 41 degrees Fahrenheit to low of 27 degrees Fahrenheit. The area averages just four days a year with high temperatures exceeding 77 degrees Fahrenheit. The nearby Lule River produces about 13.6 million MW hours of hydro-electric power, equal to 10 percent of Sweden&rsquo;s total demand for electricity. Lulea, Sweden has some of the cheapest power rates in all of Europe.</p>
<p>
	Inside the data center buildings, Facebook is implementing the server and data center designs outlined in the Open Compute Project, which the company launched in February 2012 to release its custom designs for servers, power supplies and UPS units.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:33 GMT</pubDate>
  </item>
  
  <item>
    <title>Equinix, LA3 IBX Data Center Tenant Improvement</title>
    <link>http://www.dpr.com/projects/equinix-data-center-ti</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/equinix-data-center-ti#when:00:31</guid>
    
    <content:encoded><![CDATA[<p>
	DPR provided substantial upgrades to the existing infrastructure and performed seismic enhancements. The project included structural upgrades, mechanical, electrical and fire protection, as well as remodeling to the existing conference room, office space, break room and lobby.</p>
<p>
	More than doubling the size of the worldwide market leader&#39;s Los Angeles area cabinet capacity, the project required the team to devise solutions to a host of technical challenges posed by the need to convert, or "Equinize," and existing data center unto the very detailed specifications of Equinix&#39;s high-performance centers throughout the U.S. and Asia-Pacific.</p>
<p>
	DPR delivered this complex, fast-tracked renovation two days early, on budget and with zero defects.</p>
]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:31 GMT</pubDate>
  </item>
  
  <item>
    <title>Facebook Prineville Data Center</title>
    <link>http://www.dpr.com/projects/prineville-data-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/prineville-data-center#when:00:31</guid>
    
    <content:encoded><![CDATA[<p>
	Prineville, Oregon is the site of a new data center for the popular social networking site, Facebook. The new facility is one of the most energy-efficient in the world, featuring an innovative cooling system created for the unique climate characteristics of central Oregon. The data center will use new energy-efficiency technologies, including an evaporative cooling system and an airside economizer that will bring in 100 percent ambient air. The facility will re-use server heat to warm office space in the colder months, and a Facebook patent-pending electrical design will reduce electricity usage. The entire facility is being built to LEED&reg; Gold certification standards.</p>
<p>
	Read more about Facebook&#39;s <a href="http://www.pcmag.com/article2/0,2817,2383257,00.asp" target="_blank">Open Compute Initiative</a></p>
<p>
	<a href="http://www.facebook.com/prinevilledatacenter" target="_blank">Follow the project on Facebook!</a></p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:31 GMT</pubDate>
  </item>
  
  <item>
    <title>EMC Data Center and Lab</title>
    <link>http://www.dpr.com/projects/emc-data-center-and-lab</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/emc-data-center-and-lab#when:00:28</guid>
    
    <content:encoded><![CDATA[<p>
	The RTP2 Data Center and Lab represent a significant step for DPR in the Research Triangle Park constructing Advanced Technology projects. The project consisted of constructing a new data center, IT lab and necessary support spaces within an existing 450,000-sq.-ft. tilt-wall warehouse originally built in 1995 for IBM as a manufacturing facility. The build-out took place in the center third of the building, or roughly 150,000 sq. ft. The current phase will consist of a Tier III 20,000-sq.-ft. data center paired with a 60,000-sq.-ft. lab. The 120-watt per sq. ft. data center and 120-watt per sq. ft. lab are supported by a 10 MW electrical service distributed through 10 substations. To keep this critical facility powered, three new 2 megawatt generators and two sets of three 675 kilowatt UPS modules will always ensure the RTP2 a lifeline.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:28 GMT</pubDate>
  </item>
  
  <item>
    <title>Digital Realty Trust 1100 Space Park Data Center</title>
    <link>http://www.dpr.com/projects/data-center-for-leading-global-content-provider</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/data-center-for-leading-global-content-provider#when:00:25</guid>
    
    <content:encoded><![CDATA[<p>
	Digital Realty Trust specializes in data center facilities that meet the exacting specifications of its technology-driven customers. These state-of-the-art facilities require uninterrupted power supplies (UPS), cooling capabilities, and zero downtime for maintenance.</p>
<p>
	It&#39;s no surprise then that when Digital Realty Trust needed to build out a data center and telecommunications facility in Santa Clara, it called on DPR, the technical builder that specializes in projects for advanced technology clients.</p>
<p>
	Digital Realty Trust relied on DPR to design/build this 40,000-sq.-ft., raised-floor data center and 20,000-sq.-ft. support space with rooftop cooling system. This included complete program, basis of design, schematic design and permit documents.</p>
<p>
	Brought into the process early on, DPR provided procurement and estimating services to develop the project budget and led the competitive bidding process for all mechanical, electrical, plumbing, civil, structural and architectural trades. DPR also acted as the project liaison with the City of Santa Clara Planning, Building, Public Works, Fire and Electrical departments.</p>
<p>
	While there were multiple players on the design/build team, DPR provided Digital Realty Trust a single source of accountability for the project design, schedule and budget. From the beginning, DPR set about building a cohesive team and obtaining buy in from all its members. Pre-planning efforts on every aspect of the project, from initial design and estimate to scheduling tasks and phasing subcontractors, ensured that there was sufficient time to deal with any hiccups that might arise during startup. The result? Timely delivery of the project, zero safety incidents, and no disruptions to existing tenants.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:25 GMT</pubDate>
  </item>
  
  <item>
    <title>Digital Realty Trust 1201 Comstock Data Center</title>
    <link>http://www.dpr.com/projects/1201-comstock-data-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/1201-comstock-data-center#when:00:21</guid>
    
    <content:encoded><![CDATA[<p>
	This 198 watt/sq. ft. data center was delivered one week early &mdash;completed in just 26 weeks through Level 5 commissioning&mdash;and completed with Zero Defects. Scope of work included 24,000-sq.-ft. demolition of&nbsp; the existing roof and floor slab and subsequent buildout of the mission critical facility, two electrical rooms, three generator sets, UPS, main switchboard and 14,000 sq. ft of&nbsp; 30 inch raised floor, conference room, security room, building office, new bathrooms, office space, staging and parts. Critical load of 2.4MW and cooling system involves eight self contained 120 ton roof mounted air handlers for the data center space. 1201 Comstock has been designed to the very strict 2008 California Building Code, and the structure has been upgraded to an importance factor of 1.5. This DLR property is designed to withstand a seismic event functionally.</p>
<p>
	The site was turned over to the client &nbsp;with a PUE Measurement of 1.36&nbsp;at 100% IT Load and was completed under budget.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:21 GMT</pubDate>
  </item>
  
  <item>
    <title>Digital Realty Trust 1500 Space Park Data Center</title>
    <link>http://www.dpr.com/projects/1500-space-park-data-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/1500-space-park-data-center#when:00:17</guid>
    
    <content:encoded><![CDATA[<p>
	Strategically located on major fiber routes and between two sub-stations of the cost&nbsp;effective power grids of Santa Clara, known locally as &lsquo;Datacenter Row&rsquo;, this site is&nbsp;uniquely positioned to satisfy the extensive power and data network criteria of the most&nbsp;sophisticated corporate datacenter requirements.</p>
<p>
	The project consists of a build out of an existing two-story facility that was extensively&nbsp;upgraded for data center use. Scope includes 32,139-sq.-ft. of raised floor with 110 watts/sf on the first floor and 174 watts/sf on the second floor and 4,952dW of critical power. Cooling system is eight 55,000 cfm roof mounted Climate Craft air handlers and 44 Leibert CRAHs. The air handler cooling coils are provided chilled water by four 500 ton Trane centrifugal chillers. UPS system is comprised of eight 50kVA modules and eight 626kVA modules. Mechanical cooling is water cooled chilled water with CRAH units and Packaged Air Handlers which include outside air economization to provide for excellent energy efficiency.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:17 GMT</pubDate>
  </item>
  
  <item>
    <title>Content Portal Data Center</title>
    <link>http://www.dpr.com/projects/data-center-ne1</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/data-center-ne1#when:00:04</guid>
    
    <content:encoded><![CDATA[<p>
	Conversion of a 300,000-sq.-ft. warehouse into a Tier III data center, each phase of this two phase project, consisted of 60,000 sq. ft. of raised floor at 150 watts/sf density with Rotary UPS, modular chilled water plants, and 7.5MW of day one critical power.</p>
<p>
	Several value added services were performed for this client including:</p>
<ul>
	<li>
		A site search covering 11 states, 30 communities and 50 specific sites</li>
	<li>
		Negotiation of an incentive package, including utility and infrastructure extensions and grants, enterprise zone tax credits and other incentives to assist this large client to locate in Nebraska</li>
	<li>
		Due diligence of the selected site and all associated infrastructure</li>
	<li>
		Coordination of all utility and infrastructure needs with the applicable state entities</li>
	<li>
		Iinterview, recommendation, selection and management of all specialty consultants covering air emissions, water emissions, water use, groundwater (well) and environmental permits</li>
</ul>
<p>
	This unique building configuration provides the client with a &lsquo;quicker to market&#39; solution and lower day one capital costs.</p>
<ul>
	<li>
		Developed economical mechanical and electrical systems that have the least amount of impact on the existing building structure avoiding costly reinforcement of the existing structure and a longer schedule.</li>
	<li>
		Constructing the exterior foundations and underground site utilities during the winter.</li>
	<li>
		Sequencing the delivery of major pieces of outside mechanical and electrical equipment with the exterior work due to tight sight constraints.</li>
	<li>
		Developing economical construction solutions to get the major pieces of outside mechanical and electrical equipment above the 500 year flood plain.</li>
	<li>
		Utilized the undeveloped warehouse space to pre-fabricate mechanical and electrical utilities for server racks for quick installation. Quality control and production was greatly improved due to &ldquo;shop fabrication&rdquo; in lieu of &ldquo;field fabrication&rdquo; techniques.</li>
	<li>
		Utilized very detailed field coordinated BIM technology cad drawings to maintain high level of quality control between all trades improving quality and production.</li>
</ul>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:04 GMT</pubDate>
  </item>
  
  <item>
    <title>Software Provider Data Center</title>
    <link>http://www.dpr.com/projects/content-portal-phase-i-iii</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/content-portal-phase-i-iii#when:00:03</guid>
    
    <content:encoded><![CDATA[<p>
	DPR completed this 250,000-sq.-ft. 20MW data center for a major software&nbsp;company in Quincy, Washington. The support facility will handle data processing storage for the&nbsp;company&rsquo;s internet business operations.</p>
<p>
	The building shell is structural steel with pre-cast concrete panels. The site was overexcavated&nbsp;six feet below the finished floor to make room for 46 miles of underground conduit and 45,000&nbsp;cubic yards of lean concrete backfill which will support this critical facility. Inside DPR built-out&nbsp;the infrastructure down to the remote power panels. A static UPS system with diesel generators&nbsp;provide the back-up power source.</p>
<p>
	This Confidential Software Provider joins a growing list of technology companies drawn to Quincy, a small farming town near the Columbia River in Grant County with a population just over 5,300. The town is attractive for its abundant land, inexpensive cheap power from the Columbia River and network of fiber optic cable lines.</p>
]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:03 GMT</pubDate>
  </item>
  
  <item>
    <title>Content Portal Data Center, Phase I-III</title>
    <link>http://www.dpr.com/projects/confidential-data-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/confidential-data-center#when:00:01</guid>
    
    <content:encoded><![CDATA[<p>
	This ground-up 155,000-sq.- ft. building was constructed with 40,000 sq. ft. of raised floor at 150&nbsp;watts/sq. ft. density with rotary UPS, modular chilled water plant and 5MW of day one critical power.&nbsp;The iso parallel electrical design is only the second of its kind commissioned in the world. All phases&nbsp;of this three phase project were completed with Zero Defects.</p>
<p>
	Phase II and III have 67,000 sq. ft. of raised floor at 150 watts/sq. ft. with a 14MW Critical Load.&nbsp;Modular chilled water plant cooling system with custom AHU&rsquo;s and proprietary rack cooling system,&nbsp;N+1.</p>
<p>
	This Global Content Provider joins a growing list of technology companies drawn to Quincy, a small farming town near the Columbia River in Grant County with a population just over 5,300. The town is attractive for its abundant land, cheap hydroelectric power from the Columbia River and network of fiber optic cable lines.</p>
]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Wed, 30 Nov 2011 00:01 GMT</pubDate>
  </item>
  
  <item>
    <title>CHRISTUS New Data Center</title>
    <link>http://www.dpr.com/projects/christus-new-data-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/christus-new-data-center#when:23:49</guid>
    
    <content:encoded><![CDATA[<p>
	New Tier 3, 47,000-sq.-ft. data center which includes 15,000-sq.-ft. data center white space, 20,000-sq.-ft. office and 12,000-sq.-ft. electrical support space. The facility includes a Security Operations Center (SOC) and a Network Operations Center (NOC).</p>
<p>
	The owner&#39;s initial plan called for two distinct phases: shell construction and data center finishout, with demobilization from the site between the two. This was to accommodate the company&#39;s fiscal year and funding availability. DPR recommended compressing the shell construction by two months and starting later, eliminating the need for additional demobilization/mobilization and saving on the overall budget.</p>
<p>
	The electrical underground design would not be ready in time to meet the new accelerated schedule. Completion of the building slab was a critical schedule milestone, as it was to serve as the casting bed for the tilt-up panels. However, the electrical underground design would not be ready in time for the new accelerated schedule. Under the original schedule, the massive amount of electrical conduit needed would have been installed below the slab prior to it being poured. To allow construction to proceed while electrical design was in progress, the project&#39;s structural engineers analyzed the foundation grade beam structure and made recommendations for proceeding with the slab. The approach was to utilize the four feet of flowable, lightweight concrete under the exterior grade beams for access. When the building construction was complete, a portion of the interior slab was removed and sections of the lightweight concrete excavated. Electricians were then able to run conduit from the interior of the building to the exterior yard while the interior build-out progressed.</p>
<p>
	The city utility also did not have sufficient infrastructure to support the facility by the accelerated completion date. They agreed to have power ready in time for the original completion date but could not guarantee service for the compressed construction schedule. The team enlisted a temporary services design and implementation company to design and provide temporary cooling and dehumidification of the interior to allow sensitive activities to continue without hindering the schedule.</p>
<p>
	<a href="http://www.christushealthhosting.com/">http://www.christushealthhosting.com/</a></p>
]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Tue, 29 Nov 2011 23:49 GMT</pubDate>
  </item>
  
  <item>
    <title>Kforce.com Corporate Headquarters</title>
    <link>http://www.dpr.com/projects/kforce.com-corporate-headquarters</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/kforce.com-corporate-headquarters#when:18:27</guid>
    
    <content:encoded><![CDATA[<p>
	Hardin Construction Company, LLC completed construction of Kforce.com&#39;s World Headquarters in an amazing 11-month schedule.</p>
<p>
	Hardin was challenged by Highwood&#39;s Properties and Kforce to provide them with a Class &ldquo;A&rdquo; office building utilizing a fast-track schedule which could accommodate the relocation of five of their branch offices into one facility.&nbsp; As this building was the first of its kind in the historic Ybor City area. Careful consideration was given to the aesthetics of the building.&nbsp; Various brick and building colors were utilized in order to match Centro Asturiano - a 100-year-old social club, which is a focal point of local gatherings and community events.</p>
<p>
	Kforce.com&#39;s new facility was designed to provide a casual environment which could meet every need of the Kforce.com employee by enhancing the workplace environment.&nbsp; Of the 138,000-sq.-ft. facility, 5,000 sq. ft. is dedicated to an indoor, full-service cafeteria with dining facilities and full catering services.&nbsp; An additional 15,000 sq. ft. is comprised of a full exercise arena containing state-of-the-art exercise equipment, locker rooms and showers, and a full, NCAA regulation basketball court.</p>
<p>
	The office building itself is built utilizing a steel frame structure with precast concrete and glass skin.&nbsp; Kforce chose to install an aluminum &ldquo;eyebrow&rdquo; around the entire perimeter of the building creating consistent shade to the building exterior in order to maximize the energy efficiency, yet providing an eye pleasing aesthetic appeal.&nbsp; The finished exterior product allowed construction to meet the owners schedule and budget needs while providing the building with a much richer look and feel.</p>
<p>
	The interior of the building continues to incorporate the historical look of the area by utilizing quarter-sawn cherry panel finishes and furniture.&nbsp; The lobby floor is comprised of terrazzo, and is accented on the second and third floors with Mandarin style art.&nbsp;</p>
<p>
	Safety was a concern throughout the project due to the dangers associated with erecting and securing the steel and precast walls immediately adjacent to high voltage (69kv) backup power lines which service the downtown Tampa area.&nbsp; Through careful implementation of Hardin&rsquo;s safety plan, including daily safety meetings and subcontractor awareness, the project was completed successfully with no lost-time accidents.</p>
<p>
	This facility was instrumental in the revitalization for the west side of Ybor City, and is a unique example of how new construction and state-of-the-art facilities can be incorporated into an historical environment with ease.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Mon, 19 Apr 2010 18:27 GMT</pubDate>
  </item>
  
  <item>
    <title>Citibank Center</title>
    <link>http://www.dpr.com/projects/citibank-center</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/citibank-center#when:18:17</guid>
    
    <content:encoded><![CDATA[<p>
	Hardin Construction Company was selected by Citibank to provide construction services for their new Corporate Campus located in Tampa&#39;s Sabal Park Office Development.&nbsp; This facility was to serve as Citibank&#39;s regional data processing and communications hub.&nbsp; The facility includes much of the industry&#39;s latest technology.&nbsp; The 588,000-sq.-ft. campus is comprised of four 130,000-sq.-ft., three-story, office buildings and a 138,000-sq.-ft. amenities building.&nbsp; Hardin also constructed two 1,490-space parking decks to support the office and amenities buildings.</p>
<p>
	This campus was designed to accommodate nearly 2,500 employees and includes amenities such as dining services, a fitness center, child care facilities, an ATM/ branch bank, and personal service shops such as newsstands, a drug store, a dry cleaner, hair dresser and a shoe repair shop.<br />
	The low-rise campus is surrounded by lush landscaped berms with outdoor plazas, fountains and waterfalls to provide a secluded, tranquil environment.&nbsp; Each building is interconnected by enclosed conditioned walkways to ensure personnel comfort and building security as well as provide a homogenous atmosphere among the individual buildings and associated staff.</p>
<p>
	Hardin delivered Citibank&#39;s facilities with an accelerated 14 month schedule.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Mon, 19 Apr 2010 18:17 GMT</pubDate>
  </item>
  
  <item>
    <title>Capital One Renaissance Park</title>
    <link>http://www.dpr.com/projects/capital-one-renaissance-park</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/capital-one-renaissance-park#when:17:56</guid>
    
    <content:encoded><![CDATA[<p>
	Hardin was selected simultaneously with the Architect to help the Owner achieve a "blast-track" schedule to accommodate Capital One&#39;s explosive growth. From selection of design and construction teams to owner move in, only 8 months elapsed with construction being accomplished in only 5 months, including 45 days for permitting.&nbsp;</p>
<p>
	Phase I of Capital One&#39;s build-to-suit campus began as a 25-acre greenfield site.&nbsp; The site development encompassed two lakes, lush landscaping, extensive hardscape and site utilities, all while maintaining the integrity of approximately 20 acres of wetlands, and wetlands mitigation. &nbsp;The three-story, 110,000-sq.-ft. building is a state-of-the-art data/call center which required paralled flexibility in the systems and approach to meet the aggressive schedule. Project highlights included a 100% raised floor, 2x redundant electrical and mechanical systems, 24/7 occupancy requirements, high-quality employee amenities, and an adjacent, easily-accessible parking deck accommodating 794 cars.</p>
<p>
	Also a "blast-track" schedule, Phase II of the development was a 110,000-sq.-ft. mirror image of the Phase I building and included construction of additional parking for 589 cars. A fifth level (78,400 sq. ft. / 276 spaces) was added to the existing parking deck while maintaining employee use of the existing deck.&nbsp; A separate, lateral deck expansion added 108,000 sq. ft. for 313 additional cars.</p>
<p>
	Within the next Phase III, Hardin built the three-story, 118,625-sq.-ft. Community Center which includes a fully equipped, multi-stationed training center, exercise rooms, basketball courts, the human resources department, cafeteria, multi-media breakrooms, resource center, and other employee benefit areas.&nbsp; The Community Center is positioned adjacent to a wetlands area that has been transformed into a nature center with trails, raised walkways, and a sanctuary setting. Phase III also included a 144,500-sq.-ft. office building, similar to previous buildings on-site, along with the second parking deck of 411,000 sq. ft. &nbsp;Other site amenities including a sports complex with softball fields, tennis courts and a jogging track were also constructed.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Mon, 19 Apr 2010 17:56 GMT</pubDate>
  </item>
  
  <item>
    <title>Nielsen Media Research Corporate Offices, Phases I &amp; II</title>
    <link>http://www.dpr.com/projects/nielsen-media-research-corporate-offices-phases-i-ii</link>
    <guid isPermaLink="false">http://www.dpr.com/projects/nielsen-media-research-corporate-offices-phases-i-ii#when:14:56</guid>
    
    <content:encoded><![CDATA[<p>
	The Nielsen Company headquarters campus is located on 39 acres in the middle of a natural preserve. The company&rsquo;s goal was to consolidate over 900 employees from various satellite offices in Pinellas County into one, new, highly-efficient facility. The phased site includes six unique buildings, each custom built with specific requirements designed to meet the highly technical needs of The Nielsen Company.</p>
<p>
	Phase I included five buildings:</p>
<ul>
	<li>
		Building "B&rdquo; is a 45,000-sq.-ft., four-story building that houses Nielsen&#39;s technical facility, designed to withstand a category 5 hurricane.&nbsp; At first glance, the building resembles a giant computer punch card.</li>
	<li>
		Building "C&rdquo; is a 268,000-sq.-ft., four-story building that is over 700 ft. long.&nbsp; Its primary function is support office and conference room space.&nbsp; Because it is so long, sections of the floor are color coded to give the users a "landmark" on each of the 70,000-sq.-ft. floors.&nbsp;</li>
	<li>
		Building "D&rdquo; is a 41,000-sq.-ft., three-story building with double loading dock bays.&nbsp; The lower floors accommodate "facility support" such as mail rooms and storage.&nbsp; The upper floors have additional office space and training rooms.</li>
	<li>
		Building "E" is a 16,000 SF, single story amenities building.&nbsp; The building is all glass on three sides that overlooks a brick paver courtyard to the north, lake and preserve to the east, and a large open courtyard with a Bermuda lawn to the south.&nbsp; The company&#39;s full service cafeteria abuts this area, taking full advantage of the view of the preserve.</li>
	<li>
		Building "F" is a 16,000 SF, two-story Central Plant with a large mechanical yard.&nbsp; This building houses two 750-ton water-cooled chillers, four 350-ton air-cooled chillers, and three cooling towers.&nbsp; In addition to the mechanical equipment, there are four back-up generators.&nbsp; Keeping this building up and running is critical requiring it be built with redundancy times two.&nbsp;&nbsp;</li>
</ul>
<p>
	Phase II included Building "A" - a four-story, 138,000-sq.-ft. office building plus additional tenant improvements in existing buildings (Building B and C) along with a 146,832-sq.-ft., 600-space, three-level parking deck.</p>]]></content:encoded>
    <dc:subject></dc:subject>
    <pubDate>Mon, 19 Apr 2010 14:56 GMT</pubDate>
  </item>
  

    