The seven-story, 80-bed tower addition, built by the joint venture of RodgersHardin, was constructed on top of a loading dock. Due to tight site, material delivery and staging were crucial to ensure minimal disturbance and uninterrupted services. Ongoing infection control was vital due to the close proximity and tie-ins with the existing facility.  Mechanical systems were needed to facilitate the new Bed Tower and a central energy plant expansion was incorporated. Healthcare elements included a 12 bed CV-ICU, nuclear medicine suite, two 64-slice CT rooms, and the first Cyberknife procedure suite in the state.

Related Projects