A Track Record of Success
Barclays Global Investors
Tenant Build-Out
Close
Barclays Global Investors
Tenant Build-Out
San Francisco, CA
Comprising of 282,000-sq-ft. of usable space and basement parking, this 10-story build-out is fitted out to meet technical, operational and aesthetic requirements. With an extremely aggressive schedule the team was able to finish the project on-time, delivering the project with zero defects.
Project Details
Core Market: Corporate Office
Kemira Chemicals
Tenant Improvement
Close
Kemira Chemicals
Tenant Improvement
Atlanta, GA
Using BIM, DPR collaborated early with major subcontractors on this 37,000-sq.-ft. laboratory and office project to establish target values for MEP systems and expedite fabrication. As a result, the project was designed and permitted in less than two months and completed in less than five months.
Project Details
Core Market: Life Sciences
Genentech
Oceanside Product Operations
Close
Genentech
Oceanside Product Operations
Oceanside, CA
DPR worked to develop a "hybrid design/build" approach for the award-winning six-building, 500,000-sq.-ft. manufacturing
campus, that was completed on-time, under budget, and with zero defects.
Project Details
Core Market: Life Sciences
American Red Cross
Blood Processing Center
Close
American Red Cross
Blood Processing Center
Douglasville, GA
Located on a 19-acre site, DPR built the 180,000-sq.-ft. facility, including laboratories for processing
blood and platelets, as well as blood component storage and maintenance of a rare blood bank, in adherence
to regulations determined by the U.S. Food and Drug Administration.
Project Details
Core Markets: Life Sciences, Healthcare
Carnegie Institution of Washington
Global Ecology Center
Close
Carnegie Institution of Washington
Global Ecology Center
Stanford, CA
One of the greenest buildings in the area, the Global Ecology Center includes a 45-ft. katabatic cooling tower,
Night Sky cooling system, radiant slab heating/cooling, low-flow fixtures, thermal storage, stormwater recovery
and reuse, and spectrally selective glazing and roofing.
Project Details
Core Market: Higher Education
Sacred Heart Schools
Michael J. Homer Science and Student Life Center
Close
Sacred Heart Schools
Michael J. Homer Science and Student Life Center
Atherton, CA
Winner of California Construction magazine's "Best of 2009" award in the K-12 Education category, the 44,000-sq.-ft. center features water-efficient systems, photovoltaic panels and a living roof is the first in the nation to be certified LEED¨ for Schools Platinum.
Project Details
Core Market: Higher Education
United Therapeutics
Solid Dose Facility
Close
United Therapeutics
Solid Dose Facility
Research Triangle Park, NC
After spending over a year working in preconstruction, DPR was awarded this 202,000-sq.-ft. ground
up solid dose pharmaceutical manufacturing facility.
Project Details
Core Market: Life Sciences
Arizona Board of Regents
Arizona State University Polytechnic Academic Buildings
Close
Arizona Board of Regents
Arizona State University Polytechnic Academic Buildings
Mesa, AZ
This fast-track, 248,000-sq.-ft. three-building campus houses teaching laboratories, classrooms, offices and ancillary space required four distinct, but interrelated, colleges. Additionally, the campus includes a hazardous waste facility.
Project Details
Core Market: Higher Education
The Scripps Research Institute
Florida Research Facility
Close
The Scripps Research Institute
Florida Research Facility
Jupiter, FL
Building upon a longstanding relationship, DPR constructed this research campus for the Scripps Research Institute in Jupiter, Florida. The project consists of three buildings, totaling 350,000 sq. ft. on a 30-acre site.
Project Details
Core Market: Life Sciences
University of California, San Diego
Sulpizio Family Cardiovascular Center and Thornton Hospital Expansion
Close
University of California, San Diego
Sulpizio Family Cardiovascular Center and Thornton Hospital Expansion
San Diego, CA
The education and research facilities at UCSD Medical Center, pursuing LEED-NC certification, features intensive and intermediate care rooms, emergency and clinic exam rooms, echocardiogram rooms, cardiac-catheterization labs, operating rooms and research facilities.
Project Details
Core Market: Healthcare
University of Virginia Medical Center
Hospital Renovations
Close
University of Virginia Medical Center
Hospital Renovations
Charlottesville, VA
This project includes the complete renovation of the radiology department at the University of Virginia Medical Center including the construction of four electrophysiology labs, an intraoperative MRI, two additional operating rooms and the renovation and relocation of surgery pathology.
Project Details
Core Market: Healthcare
HCA
South Austin Hospital
Close
HCA
South Austin Hospital
Austin, TX
DPR and HCA have teamed up successfully on more than 25 projects over the last eight years, including
an expansion and addition at South Austin Hospital. The project includes a new 100,000-sq.-ft., four-story
medical tower, tied into existing facility, plus a 36,000-sq.-ft. renovation.
Project Details
Core Market: Healthcare
Freescale Semiconductor, Inc.
Gowning Room
Close
Freescale Semiconductor, Inc.
Gowning Room
Austin, TX
Ten tons of components were imported from Scotland for this three-story addition. Throughout construction,
Freescale maintained 100 percent of its operations and implemented a new fan-filter system that helped achieve
Class 1 cleanroom certification in three days compared to standard two-to-three weeks.
Project Details
Core Market: Microelectronics
Wachovia Corporation
New Retail Bank
Close
Wachovia Corporation
New Retail Bank
Austin, TX
DPR has completed 33 projects for Wachovia, including this 4,000-sq.-ft. new branch bank that is pursuing
Gold LEED certification. Taking a green approach, the bank saw overall construction cost savings, lower water
usage and a reduction in its overall carbon footprint.
Project Details
Core Market: Corporate Office
Allsteel
Allsteel/Gunlocke Showroom
Close
Allsteel
Allsteel/Gunlocke Showroom
San Francisco, CA
Achieving Silver LEED-CI certification, DPR provided leadership throughout the certification process of the
13,500-sq.-ft. tenant improvement for Allsteel Gunlocke's new San Francisco Resource Center at Maritime Plaza.
Project Details
Core Market: Higher Education
Pixar Animation Studios
Headquarters
Close
Pixar Animation Studios
Headquarters
Emeryville, CA
The 218,000-sq.-ft. steel-frame headquarters features advanced technical production rooms, an open
ceiling with fully exposed mechanical and electrical systems, and 423,000 hand-laid bricks and pavers.
Project Details
Core Markets: Entertainment, Corporate Office
Stanford University Hospital and Clinics
Stanford Outpatient Center
Close
Stanford University Hospital and Clinics
Stanford Outpatient Center
Redwood City, CA
DPR redeveloped 220,000 sq. ft. of office space into a state-of-the-art, OSHPD-3 ambulatory clinic that includes an outpatient surgery center, imaging and facility support systems. Structural upgrades, new MEP systems and exterior site work were also included.
Project Details
Core Market: Healthcare
Confidential Client
Data Center
Close
Confidential Client
Data Center
La Vista, NE
Conversion of a 300,000-sq.-ft. warehouse into a Tier III data center, each phase of this two phase project, consisted of 60,000 sq. ft. of raised floor at 150 watts/sf density with rotary UPS, modular chilled water plants, and 7.5MW of day one critical power. This project is LEED certified.
Project Details
Core Market: Mission Critical
Intuit
San Diego Campus Consolidation
Close
Intuit
San Diego Campus Consolidation
San Diego, CA
Intuit's LEED-CI Gold certified San Diego facility consolidation project brings employees
from four facilities into one 440,500-sq.-ft. campus, including administration, training, IT, cafeteria,
and other ancillary space.
Project Details
Core Market: Corporate Office
Magic Technologies
High-Tech Manufacturing Facility
Close
Magic Technologies
High-Tech Manufacturing Facility
Milpitas, CA
DPR likely set a record by completing this 108,000-sq.-ft. renovation in just four-and-a-half months, including the
conversion of office space into a 22,000-sq.-ft. Class 1 cleanroom with associated support facilities and infrastructure.
Project Details
Core Market: Microelectronics
Camino Medical Group
Medical Office Building
Close
Camino Medical Group
Medical Office Building
Mountain View, CA
Combining BIM with lean construction techniques, DPR completed the 250,000-sq.-ft. three-story
medical office building and 400,000-sq.-ft. parking structure with 15 to 30 percent better
labor productivity than industry standards.
Project Details
Core Market: Healthcare
Facebook
Data Center
Close
Facebook
Data Center
Prineville, OR
When it comes online in early 2011, the new facility for the popular social networking site will
be one of the most energy-efficient in the world, featuring an innovative cooling system created
for the unique climate characteristics of central Oregon. The entire facility is being built to
LEED¨ Gold certification standards.
Project Details
Core Market: Mission Critical
Suniva
Solar Cell Manufacturing Facility
Close
Suniva
Solar Cell Manufacturing Facility
Norcross, GA
The project went from completely empty space to producing cells in 16 weeks. The solar cell manufacturing facility included the design and construction of high purity water systems, on-site waste treatment system, chemical delivery systems, chemical bunker, and high purity piping.
Project Details
Core Market: Advanced Tech
University of California, San Francisco
Regeneration Medicine Building
Close
University of California San Francisco
Regeneration Medicine Building
San Francisco, CA
Using BIM, DPR collaborated early with major subcontractors on this 37,000-sq.-ft. laboratory and office project to establish target values for MEP systems and expedite fabrication. As a result, the project was designed and permitted in less than two months and completed in less than five months.
Project Details
Core Market: Life Sciences
Autodesk, Inc.
Office and Customer Briefing Center
Close
Autodesk, Inc.
Office and Customer Briefing Center
San Francisco, CA
One of more than 20 projects built by DPR for Autodesk, the 45,000-sq.-ft. corporate office and customer briefing center for Autodesk was delivered utilizing an integrated project delivery approach. The project used the latest Autodesk software in BIM and achieved LEED-CI Platinum certification.
Project Details
Core Markets: Advanced Tech, Corporate Office
B. Braun Medical
Water for Injection System Upgrade
Close
B. Braun Medical
Water for Injection System Upgrade
Irvine, CA
The ultimate goal of the Irvine Water for Injection Storage and Generation System Upgrade Project is a robust, flexible, energy-efficient, GMP compliant, cost effective, automated purified water generation system that can quickly respond to changing production needs and future capacity expansion.
Project Details
Core Market: Life Sciences
Butte-Glenn Community College District
Butte College Instructional Arts Building
Close
Butte-Glenn Community College District
Butte College Instructional Arts Building
Oroville, CA
With a sustainability strategy that includes achieving carbon neutrality by 2015 in concert with the strict budget constraints, DPR relied on innovative thinking to make the 77,000-sq.-ft. Instructional Arts building a reality. The team also implemented a "paperless" project management system.
Project Details
Core Market: Higher Education
US Pharmacopeia
Headquarters Consolidation
Close
US Pharmacopeia
Headquarters Consolidation
Rockville, MD
DPR completed the $68 million project for the global, nonprofit organization that promotes public health by establishing state-of-the-art standards to ensure the quality of medicines, food ingredients and other healthcare technologies. The project consolidates USP's headquarters on one site.
Project Details
Core Market: Life Sciences
Digital Realty Trust
1201 Comstock Data Center
Close
Digital Realty Trust
1201 Comstock Data Center
Santa Clara, CA
DPR's 1201 Comstock project for Digital Realty Trust achieved LEED-CI Platinum certification. Built in 26 weeks, the 24,000-sq.-ft. facility is the first data center in California to reach the USGBC's "greenest" certification level.
Project Details
Core Markets: Mission Critical
Apple
San Francisco Flagship Store
Close
Apple
San Francisco Flagship Store
San Francisco, CA
Demolishing 16,089-sq.-ft. of an existing structure in the heart of downtown San Francisco, DPR
constructed a new two-story steel-framed building to serve as Apple's San Francisco flagship store.
Project Details
Core Market: Higher Education
Kaiser Permanente
Station Place 3 Medical Office Building
Close
Kaiser Permanente
Station Place 3 Medical Office Building
Washington, DC
DPR is currently building out 152,000 sq. ft. on four floors within the Station Place 3 Building. The project includes a comprehensive imaging suite, pharmacy, laboratory, conference facility, exam and procedure rooms and offices, as well as extensive mechanical, electrical and plumbing work.
Project Details
Core Market: Healthcare
City of Hope National Medical Center
Michael Amini Tansfusion Medicine Center
Close
City of Hope National Medical Center
Michael Amini Tansfusion Medicine Center
Washington, DC
Seeking LEED-NC Gold certification, the new 60,000-sq.-ft., three-story Blood Transfusion Medicine Center will support transfusion service/blood bank/stem cell processing laboratory, donor center, therapeutic aphaeresis, as well as the administrative functions required to support these programs.
Project Details
Core Markets: Healthcare, Life Sciences
Banner Health
Del E. Webb Medical Center Expansion
Close
Banner Health
Del E. Webb Medical Center Expansion
Sun City West, AZ
DPR provided preconstruction and construction management services for the Banner Del. E. Webb Medical Center expansion. The new expansion consists of a 205,136-sq.-ft., six-story patient tower expansion on an existing campus.
Project Details
Core Market: Healthcare
Kaiser Permanente
Napa Data Center
Close
Kaiser Permanente
Napa Data Center
Napa, CA
DPR preformed preconstruction and construction services for the renovation of this 157,000-sq. ft. data
center to accommodate 100,000-sq. ft of raised floor, 15,000-sq. ft. of office space and MEP system upgrades.
Project Details
Core Markets: Mission Critical
Sutter Health
Sutter Medical Center
Close
Sutter Health
Sutter Medical Center
Castro Valley, CA
Being delivered using IPD and BIM, construction is currently underway on a ground-up, 130-bed, acute care hospital, totaling 230,000 sq. ft. The new center will include all private rooms within the hospital, a Level 2 Trauma Emergency Department, diagnostic imaging, interventional services, intensive care and women's services.
Project Details
Core Market: Healthcare
Access All Projects